Case Studies


Aircraft Structural Test on Helicopter Airframe
When a UK-based helicopter manufacturer embarked on the full-scale structural test of a new helicopter variant, they knew they needed to achieve...
Read More

Aircraft Structural Wing Test System – Facility Enhancement
One of the world’s largest aircraft providers faced the need to enhance efficiencies across all its structural testing facilities, Moog and Savery...
Read More
Jaguar Land Rover Hydraulic Ring Main System
Design and manufacture a brand new ring main system for Jaguar Land Rover. The new system needed to provide Jaguar Land Rover with core hydraulic...
Read More
Hull flood barrier operating mechanism
The Hull barrier is a 212 tonne (215,000kg), 98ft (30m) wide gate which is supported between two towers that house the operating machinery....
Read More
Servo hydraulic test facility – Gaydon Test Centre
Rover Group wanted to install a new facility which was to comprise of four individual test cells for full vehicle testing, a general purpose test...
Read More
BAE Warton – Advanced hydraulics systems monitoring
An existing hangar was to be stripped out and refurbished to accommodate the production of Typhoon (Eurofighter) aircraft. ...
Read More
DARA – Aircraft hydraulic ring main systems
DARA was an executive agency of the Ministry of Defence responsible for the maintenance of Royal Air Force, Army and the Royal Navy’s aircraft....
Read More